Steven -Complete review of historic data for riparian width, canopy cover -project logistics pertaining to stream width -Finish statement of project needs pertaining to riparian zone
James -Collaborate with other groups about 2-stage ditch -Assess past, present riparian species -State which native species can be used to fill functional niches -Find peer reviewed papers associated with riparian species and 2-stage ditches
I have not been able to discuss this with Heather, so these tasks are subject to change. Luise --Obtain bank height measurements and correctly calculate channel volume --research the viability of moving the HPER channel to connect with the dump site --find two peer reviewed papers which investigate channel movement
4novemeber2013-11novemeber2013
ReplyDeleteErica
• complete statement of project needs for planning
• statistical analysis
• item 18-19 of post management and monitoring strategies
• find four relevant peer reviewed papers
Carolyn
• complete project logistics
• statistical analysis
• item 16-17 of post management and monitoring strategies
• find four relevant peer reviewed papers
Steven
ReplyDelete-Complete review of historic data for riparian width, canopy cover
-project logistics pertaining to stream width
-Finish statement of project needs pertaining to riparian zone
James
-Collaborate with other groups about 2-stage ditch
-Assess past, present riparian species
-State which native species can be used to fill functional niches
-Find peer reviewed papers associated with riparian species and 2-stage ditches
I have not been able to discuss this with Heather, so these tasks are subject to change.
ReplyDeleteLuise
--Obtain bank height measurements and correctly calculate channel volume
--research the viability of moving the HPER channel to connect with the dump site
--find two peer reviewed papers which investigate channel movement