I was researching the addition of bends in the HPER ditch and found a great schematic for what we are trying to do. It is from a book and a link to the pdf is here http://directives.sc.egov.usda.gov/OpenNonWebContent.aspx?content=17771.wba
The schematic is Figure 11-1
Let me know what you think.
Sunday, November 17, 2013
website for permits
This link is for Washington state but I think it will still be a good reference.
http://apps.oria.wa.gov/permithandbook/handbook.asp
http://apps.oria.wa.gov/permithandbook/handbook.asp
Global restoration network database
I really enjoy looking at the global restoration network database. Not only do I get ideas for test questions, but it is useful to see the different restorations around the world, the approaches based on stated goals, and also the costs.
http://www.globalrestorationnetwork.org/database/
http://www.globalrestorationnetwork.org/database/
Friday, November 15, 2013
a. Purpose
a) Improve
habitat for aquatic and terrestrial species
b) Improve hydrology
c) Improve water
quality in Hyper creek
d) Education/
research
e) Heighten public
awareness/ encourage use
b. Need
a) Address water
quality
b) Stem encroachment
of exotics not yet prevalent in JMNR (Bradford Pear, Black Locust for example)
c) Engage public
to ensure continued protected status
d) Improve native
species diversity
c. Goals
a) Improve hydrology/geomorphology
1) Transform ditch
to two stage ditch to accommodate flow while increasing bank angle and allowing
for establishment of riparian vegetation.
2) Add sinuosity
– reduce flashiness
b) Create riparian
zone of distinct species
c) Stem encroachment
of exotic invasive plant species that are not yet prevalent in JMNR.
1) Remove vegetation
from dumpsite
2) Install botanical
garden with green space to discourage reestablishment of invasive species.
d) Improve water
quality
1) Add small
wetland or ponds near Dave Ward
e) Increase instream
habitat heterogeneity
1) Add wood
f) Facilitate
public access to stream
1) New riparian
zone
2) Bend in
creek integrated with botanical garden installation
g) Create
public interest and encourage visits to restoration sites and JMNR
1) Install botanical
gardens
2) Engage stakeholders
to hold events/create unique space through art
h) Increase species
diversity
1) Kill
privet/Japanese honeysuckle along creek
2) Installation
of novel riparian ecosystem
3) Benthic macroinvertebrate
population; positive response to improved habitat/reduced flashiness.
i)
Education and research
1) Historic prairie
restoration
2) Native species
featured in garden beds
3) Data collections
and monitoring; post restoration
a) birds,
pollinators, plants, macro invertebrates, biofilm
b) Stream
bank stability/ stream bed heterogeneity
c) Water quality
d. Restoration
approach
a) partial
restoration (small prairie at dumpsite),
b) complete
alteration (dumpsite)
c) partial
construction (two stage ditch; wetland area near Dave Ward)
d) hybrid –
install riparian vegetation to create riparian zone
e) passive- species
residing in sections of creek downstream of restoration and wetlands will benefit from restoration.
e. Stakeholders
and quadrants addressed
a) City of
Conway – Campus considered big selling point.
b) General
Public
c) UCA Staff,
faculty, students in general
d) Gallery,
public art committee, art department
1) Possible venue
for exhibits and permanent installations
e) Music department
(possibly)
f) Faulkner
County Master gardeners (possibly)
g) UCA Board
of Directors
h) NRCS –
proposed wetlands would improve water quality headed towards Lake Conway.
Socio-Economic
Improve
water quality
Possible increase in property values
Proven
positive health effects from connecting with nature
(lots of supporting data).
(lots of supporting data).
Selling
point for Conway to draw in businesses
(increased employment; more revenue for city)
(increased employment; more revenue for city)
Ecological
Improved
nutrient cycling/ecosystem functions
Increase
in biodiversity
Improved
instream habitat
Control
of invasive exotics (try to anyway)
Cultural
Art/music
Garden
will be a place for public gatherings
Historic prairie/native plants in
beds
Personal
Garden/new
riparian area facilitates connection to nature
(pretty flowers;soothing waters)
(pretty flowers;soothing waters)
Repeated
use strengthens attachment
f. Project
duration and cost
a) 6 months
From a Master Gardener
Just putting some quick notes here.
My aunt is a Master Gardener, and I got together with her to see if she had any suggestions for our proposed garden. She hasn't personally participated in a project of this scope; she usually deals with this more on the level of a back yard.
I explained the plan so far, and she agreed that it seems quite doable with what we have. She advised against using fill material to build up landscaping because there's a risk of invasive plants in the seed bank growing back through. She immediately knew the problems when I described the plants we are dealing with (Bradford pear and black locust), and warned that they might be a bigger problem than we're currently expecting. She totally supported bulldozing them to the ground.
One suggestion that we hadn't really considered was a small vegetable patch. This would require testing to soil to make sure it's safe to grow food plants there, but it could be a valid possibility as maybe a future addition.
She also has an entire shelf of books on Arkansas plants that I can obtain if we need/want them for references.
My aunt is a Master Gardener, and I got together with her to see if she had any suggestions for our proposed garden. She hasn't personally participated in a project of this scope; she usually deals with this more on the level of a back yard.
I explained the plan so far, and she agreed that it seems quite doable with what we have. She advised against using fill material to build up landscaping because there's a risk of invasive plants in the seed bank growing back through. She immediately knew the problems when I described the plants we are dealing with (Bradford pear and black locust), and warned that they might be a bigger problem than we're currently expecting. She totally supported bulldozing them to the ground.
One suggestion that we hadn't really considered was a small vegetable patch. This would require testing to soil to make sure it's safe to grow food plants there, but it could be a valid possibility as maybe a future addition.
She also has an entire shelf of books on Arkansas plants that I can obtain if we need/want them for references.
JMNR Riparian Project Outline
This is what I have outlined so far:
a. Purpose
i.
– Ecological Values: To improve biodiversity and
ecosystem functioning, increase riparian zone width, and establish a suitable
hydrology that would support a healthy riparian zone.
ii.
Cultural Values: To directly involve all
stakeholders through improving aesthetics, improve accessibility to, and
facilitate the reentry of the UCA community into a shared iconic site.
iii.
Socioeconomic Values: To improve floodwater
retention through the reestablishment of a functioning riparian zone.
iv.
Personal Values: To provide a place for students,
faculty, and Conway residents to escape urbanization and reenter nature.
b. Needs
i.
To determine what mixture of plants should be used in revegitation based on
historic data and function [Need to contact Dr. Noyse
to aid in planning the optimum mixture of seeds for re-seeding the riparian
zone]
c. Goals
i.
To establish a functioning riparian area around the
HPER ditch in the JMNR in order to improve water quality, retain flood waters,
and reduce erosion.
d. Restoration
approach
i.
Bank slope – Reduce the steepness of the current
~90° bank slope to reduce erosion. This could be done with heavy machinery.
ii.
Buffer zone width – Establish recommended minimum of
10 feet for bank stabilization, stream shading, water quality protection, and
detrital input.
iii.
Invasive exotics – Remove privet by mechanical removal,
cutting, burning…etc (Early Detection Rapid Reponse: http://www.naisma.org/
edrr) [Need to assess whether privet removal could have unintended
results. Most notably on erosion control, stream shade, and the avian community]
iv.
Revegetation with native functional groups – Seeding
multiple native members of functional groups for redundancy.
e. Stakeholders
i.
Citizens of Conway
ii.
UCA students, faculty, and administrators
f. Quadrants addressed
i.
– Ecological Values: Addresses biodiversity and
ecosystem functioning of the stream and riparian zone by increasing the width
and quality of the riparian zone allowing for improved water quality through
enhanced filtering of surrounding inputs of excess nutrients, pollutants, and
sediment.
ii.
Cultural Values: Directly addresses the stakeholders
by improving aesthetics, improve accessibility to, and facilitating the reentry
of the UCA community into a shared iconic site.
iii.
Socioeconomic Values: Addresses floodwater retention
through the reestablishment of a functioning riparian zone. Could be good
publicity for UCA as a university that is environmentally conscious
iv.
Personal Values: Addresses the needs of the
students, faculty, and Conway residents by providing a natural area for
educational and recreational activities
g. Project
duration
i.
[I am not sure what would be a reasonable
time frame]
h. Project cost
i.
[I am not sure what would be a realistic
overall cost]
II. Planning
A. Statement of project need
1.
Identify the project site location and its
boundaries.
-
JMNR
near HPER
-
(35°04’31.28”
N, 35°04’31.28” W)
2.
Identify ownership.
-
President
(Tom Courtway)
-
UCA
Board of Trustees (Ms. Elizabeth Farris, Mr. Robert “Bunny” Adcock, Mr. Bobby
Reynolds, Mrs. Kay Hinkle, Mr. Brad Lacy, Mrs. Shelia Vaught, and Mr. Victor
Green)
3.
Identify the need for ecological restoration.
i.
Document the project site history that led to the
need for restoration
§ According to the 1800s survey on the
JMNR there was no historic stream. Instead the HPER ditch is a manmade
construct with the purpose of draining water from UCA campus.
ii.
Identify the kind of ecosystem to be restored.
§ The HPER ditch and surrounding
vegetation make up a novel ecosystem that differs from its historic state. In
this project the riparian zone will be reconstructed to improve form and
function.
iii.
Identify physical site conditions in need of repair.
§ The current bank slopes of
about 90° need to be reduced to allow
for periodic flooding of the riparian area. The width of the riparian zone
should be increased, which maybe involve altering the slope of the buffer zone
to slow the incoming water and allow for better infiltration of water.
4.
Identify restoration goals for overall site and
habitat-specific.
5.
Identify stressors in need of regulation or
re-initiation.
6.
Describe reference conditions compared to
current site conditions.
B. Project logistics (What, how, and
how much)
7.
Identify and list the kinds of biotic interventions
that are needed.
i.
Exotic
invasive species removal (Chinese privet, Japanese honeysuckle, etc…)
ii.
Seed
riparian area with native plant species (multiple members of the same
functional groups for redundancy)
8.
Identify landscape restrictions.
i.
Surrounding
impervious surfaces increase the input of sediment, nutrients, and pollutants
ii.
Fragmentation
9.
Identify project-funding sources.
i.
UCA
10.
Identify labor sources and equipment needs.
i.
Manual
labor volunteer or paid
ii.
Heavy
machinery, shovels, fire…etc
11.
Identify biotic resource needs and sources
i.
Native
plant species seeds
12.
Identify the need for securing permits required by
government agencies.
i.
Plant
Protection and Quarantine (PPQ) issued by APHIS
13.
Identify permit specifications, deed restrictions,
and other legal constraints.
14.
Identify
project duration.
15.
Itemized
budget
C. Post management and monitoring
strategies
i.
Physical
removal of invasive (Early Detection
Rapid Reponse)
ii.
Controlled
burns
iii.
Monitoring
[Perhaps by a joint effort of UCA biology faculty and
students. Also maybe clubs like the biology and environmental clubs]
17.
Describe expected restoration outcomes
i.
A functioning riparian zone that improves water
quality, prevents erosion, and can better provide water drainage services to
UCA
ii.
An aesthetically improved natural site for the
enjoyment of the local Conway and UCA communities
18.
Describe monitoring strategies after restoration
activities.
19.
Describe how ecological quadrants will be addressed.
D. References
Cite
at least 8 peer reviewed papers and 3 websites that were used to develop the
restoration plan.
Subscribe to: